The Rising Sun, Haverigg
The roof was coming off anyway, so the panels went in it rather than on it. A 10.92 kWp in roof array set into new slate, with 35.72 kWh of storage behind it.
Read the case study
Case studies
Every job we write up carries the design estimate, the specification and the notes behind the numbers. No rounded up savings, no stock photography, no borrowed roofs. If a figure is an estimate we say so.
The roof was coming off anyway, so the panels went in it rather than on it. A 10.92 kWp in roof array set into new slate, with 35.72 kWh of storage behind it.
Read the case study
Panels are on, battery is in, the whole lot is humming away nicely. The write up is queued behind three more installs.
Case study coming
Scaffold is still up. So is the photographer, currently, and he is not coming down until the light is right.
Case study coming
A very large roof and a very long extension lead. We will write it up once everybody is back down at ground level.
Case study coming
Fitted in the rain, obviously. Everything is working beautifully. The paperwork is still drying out.
Case study coming
Loft done, boards back down, kettle on. Photos exist. Somebody just needs five minutes at a desk to sort them.
Case study coming
Two streets from the Rising Sun, as it happens. Word got round. The lads are still over there.
Case study coming
Give it a few weeks. We are fitting faster than we are writing. Try loosening a filter, or ring us and ask, because odds are we have done one very like it.
Why half of these say coming soon
The installs are running well ahead of the paperwork, which is the right way round as far as we are concerned. Every job gets photographed before, during and after, so the write ups will land. They just land a little way behind the vans.
If you have a re roof, an extension or a rising electricity bill in Lancashire, Cumbria or anywhere across the North West, that is the moment to have the conversation. Survey first, figures second, no pressure either way.