Why a retrofit programme should assess and fix ventilation before insulating: what PAS 2035 and Approved Document F require, the damp and mould risk, and a pre-works checklist.
Twelve checks to run before a retrofit subcontractor joins a funded programme: certification per measure, PAS 2035 roles, lodgement, guarantees, insurance and vetting.